section 3
3.12 | final wiring checklist
FINAL WIRING CHECKLIST BEFORE POWERING UP SYSTEM
Have you checked all home runs?
Have you checked all wiring between oors (risers)?
Are you sure all grounds are properly tied between Emerald OPs?
Have you made sure all Data and Audio and Speaker wires are tested and installed?
Check polarity of all wiring throughout, especially power cables. If continuity is
reversed at any point, some or all of the Emerald OPs will be irreversibly damaged.
NEVER WORK WITH POWER WIRE, OR CONNECT POWER WIRES TO
EMERALD OPs, WHILE POWER IS ON.
2
4
5
1
3
TIP
TIP! Check data wires
by going to the Sound
Manager Congurator and
refreshing Emerald OPs
after each Emerald OP
is connected. This will
help to eliminate large
trouble shooting issues
at the end of the job.
WARNING
NEVER WIRE or CONNECT
POWER TO AN EMERALD
OP WHILE POWER IS ON!!!
EMERALD OP will lose its
number identity. Always
connect wire to EMERALD OP
while power supply is
not plugged in.